Geo-Info Ltd. - Specialist Surveyors

Jump to content

UK: +44 (0)13 8343 5982 | ROI: +353 (0)44 934 2743

Track Survey for Bridge Renewal

Geo-Info were commissioned to assist in a bridge renewal project where a new heavy load bearing bridge was to be designed. One of the main considerations for the project was to cause minimal disturbance to the rail below.

Scope of Work

A full survey needed to be acquired to ensure that the bridge was designed correctly to the current topography of the area. A traditional topographical survey and laser scan with eight set ups was acquired, to ensure that minimum track time was required.

Latest 'Blog Entries

New Technical Assistants - Katie Duncan & Belen Gomez Liste

Welcome to our new Technical Assistants - Katie Duncan & Belen Gomez Liste … Read More

New Operations Manager - Kevin Sear

Welcome To Our New Operations Manager for the South - Kevin Sear … Read More

New Geo-Info Vans

New Additions to the Geo-Info Fleet … Read More

Our Clients and Suppliers